-
Example of PDIV and PDEV test of coil with semicon damage
-
3.0 kV AC testing of 6 kV stator, non-connection side
-
4.8 kV AC testing of 6 kV stator, non-connection side
-
6.0 kV AC testing of 6 kV stator, connection side
-
6.0 kV AC testing of 6 kV stator, non-connection side
-
380 kV substation, corona at insulators – corona rings
-
Endwinding distance problem at 5 kV with reflections on the end-sheets, 10 kV Stator
-
Gap discharges at twisted pair samples – repetitive pulse load