IRIS POWER

Justification to Adopt Continuous PD Monitoring in Hydrogenerator Plants

Published Jun 20th, 1998

Company:

ISAGEN Columbia, San Carlos P.S., Jaguas P.S.

Machine Description:

Hydrogenerator, 16.5 kV, 159 MVA, and 13.8 kV, 90 MVA

Toshiba, installed in 1980

San Carlos – 17 start-ups/year, high variation in load and temperature.
Jaguas – 235 start- up/year, zero to maximum load reached in 5 minutes

Two 80pF couplers per phase installed in 1996 – 1997

Justification to Adopt Continuous PD Monitoring in Hydrogenerator Plants

After two years of commercial operation the units at these plants were showing signs of advanced deterioration of the semi-conductive and grading coating systems. Offline tests and inspections determined that PD activity was occurring on approximately 80% of the winding. The coatings were repaired and the manufacture agreed to replace the wedges where necessary. Approximately three years after this 92-day per unit maintenance outage, a strong ozone odor was again detected. The root cause of the PD activity in these hydrogenerators was due to a relatively high design electric stress (~ 3.8kV/mm) due to the thickness of the groundwall insulation (2.4mm at San Carlos and 2.1mm at Jaguas). Engineering personnel recommended the coils be continuously repaired and the units exhaustively inspected and tested for the life of the coils. The estimated revenue losses associated with this course equated to $370,000 US per year. For these reasons it was decided to implement a continuous monitoring partial discharge system. Among the benefits provided by the system were remote access (providing labor resource savings), and maintenance prioritizing based on unit condition rather than time allowing for maintenance resources to be focused where needed the most while extending the overall time between maintenance outages.  The installation of a continuous monitoring system allowed the utility to take tighter control of maintenance expenses, more closely monitor developing machine conditions, and as well, gave them the ability to validate the effectiveness of the maintenance work.

Reference:

Rodrigo Viteri, Lerner Ferrer – ‘Experience With On-line Partial Discharge Monitoring of Hydrogenerators’, IRMC – Dallas, TX, 1998

DOWNLOAD ARTICLE (PDF)

Find the Information You Are Looking For

Filter By Type of Asset
Filter By Type of Monitoring
By Type of Resource

Looking for more Information

Sign up to receive our latest whitepapers, webinars, new product information, product updates and more.