History
• the plant was commissioned in 1957.
• two units, ~30 MW each (Francis)
• three phase synchronous generator (10.5 kV, 36000
• nominal rotational speed 300 rpm (20 pole unit, 50
• suspended design (thrust bearing above the generator)
• both units had similar issues