IRIS POWER

Balancing of Hydro Stator Winding in Case of Multiple Coil By-Passing

Published Jun 22nd, 2021 IRMC 2021, Jean-Louis Drommi

STRATEGY FACING AN EARTH FAULT

By pass the faulty coil:

  • And Keep operating with by passed coil
  • Sometimes several coils are by passed on same machine
  • Applicable to any machine
  • Though beyond 100MVA, operators are reluctant
  • Cost effective
  • Repair takes a few days (10
DOWNLOAD ARTICLE (PDF)

Find the Information You Are Looking For

Filter By Type of Asset
Filter By Type of Monitoring
By Type of Resource

Looking for more Information

Sign up to receive our latest whitepapers, webinars, new product information, product updates and more.