Overview
- Introduction
- Problem Statement System Requirements Engineering Development Design
- Revision
- Future Work
Introduction
- Holliday’s Bridge Hydroelectric Plant, South Carolina.
- One (1) Motor-Generator Set used as the primary excitation system for two (2) generators
- MG Set Serviced on June 2017. – Commutator was Turn-And-Undercut on site.
- Commutator was in such a bad condition that it had to be serviced a year after.