High Partial Discharge Activity in Unit 3 Noxon Rapids Became Low After Rewinding

In 1998, partial discharge measuring equipment was installed as part of the control/monitoring systems upgrade. This consisted of two capacitive couplers on each phase connected to a HydroTrac continuous on-line monitoring system. When commissiong the system, engineers from Iris remarked that Unit 3 had some of highest partial discharge activity they had ever seen. Avista used data supplied by the partial discharge equipment to track stator winding condition. Partial discharge remained at very high levels and steady until the unit was rewound in 2004. Partial discharge activity has returned to levels expected from a new winding. It will be monitored over the life of the winding for signs of insulation decay.

High-PD-activity

High-PD-activity

HydroTrac-Monitoring-System-and-VibroSystM-ZOOM

HydroTrac-Monitoring-System-and-VibroSystM-ZOOM

Reference:

Excerpt from article “Using On-Line Monitors to Improve Performance and Plan Corrective Actions”, by M. Walden and J. Hamill” in Hydro Review / November 2005

 

DOWNLOAD ARTICLE (PDF)

Find the Information You Are Looking For

Filter By Type of Asset
Filter By Type of Monitoring
By Type of Resource

Looking for more Information

Sign up to receive our latest whitepapers, webinars, new product information, product updates and more.